MENU
  • A
  • A
  • A

INTERNAL LIMITED(Preview)

内部限定


This page is intended to share information within the Cognitive Neuroscience Application Center at Tohoku University and is not intended to be viewed by external parties. The Center cannot answer questions about the content from outside and is not responsible for its accuracy.


Daily inspection when using the MRI room

Return to Summary 
1. Requirements
1.1 Online Content
Read the content on this website and the linked pages to understand the daily inspection procedures for the MRI room.

1.2 Practical Training
Learn the practical methods for conducting daily MRI room inspections through experimental training.


2. Online Content
The following two checklists must be filled out by the person in charge:

(1) MRI Room Use Checklist
The person in charge must complete this checklist at the end of each experiment and before leaving the MRI room.

(2)Daily Checklist
This checklist must be filled out once a day by the first experimenter of the day.

Attachments